Browsing by Author Mosheiov, Gur

Jump to: 0-9 A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
or enter first few letters:  
Showing results 1 to 10 of 10
Issue DateTitleAuthor(s)Citation
2009Batch Scheduling on Two-Machine Flowshop with Machine-Dependent Setup TimesOron, Daniel; Ben-Dati, Lika; Mosheiov, Gur; Business AnalyticsBatch Scheduling on Two-Machine Flowshop with Machine-Dependent Setup Times, Advances in Operations Research, vol.2009, Article ID 153910, 2009,pp 1-10
2006Due-date assignment and maintenance activity scheduling problemOron, Daniel; Mosheiov, Gur; Operations Management and EconometricsDue-date assignment and maintenance activity scheduling problem, Mathematical and Computer Modelling, vol.44,(11-12),2006,pp 1053-1057
2012The equal allocation policy in open shop batch schedulingOron, Daniel; Mor, B; Mosheiov, Gur; Business AnalyticsThe equal allocation policy in open shop batch scheduling, Journal of the Operational Research Society, vol.63, 5, 2012,pp 646-652
2010Job-Dependent Due-Window Assignment Based on a Common Flow AllowanceOron, Daniel; Mosheiov, Gur; Operations Management and EconometricsJob-Dependent Due-Window Assignment Based on a Common Flow Allowance, Foundations of Computing and Decision Sciences, vol.35, 3,pp 185-195
2005Minimizing flow-time on a single machine with integer batch sizesOron, Daniel; Mosheiov, Gur; Ritov, Yaacov; Operations Management and EconometricsMinimizing flow-time on a single machine with integer batch sizes, Operations Research Letters, vol.33, N/A, 2005,pp 497-501
2012Minimizing the number of tardy jobs on a proportionate flowshop with general position-dependent processing timesOron, Daniel; Mosheiov, Gur; Business AnalyticsMinimizing the number of tardy jobs on a proportionate flowshop with general position-dependent processing times, Computers and Operations Research, vol.39, 7, 2012,pp 1601-1604
2007Minmax scheduling with job-classes and earliness–tardiness costsOron, Daniel; Mosheiov, Gur; Operations Management and EconometricsMinmax scheduling with job-classes and earliness–tardiness costs, European Journal of Operational Research, vol.177,(1),2007,pp 612-622
2008Open-shop batch scheduling with identical jobsOron, Daniel; Mosheiov, Gur; Business AnalyticsOpen-shop batch scheduling with identical jobs, European Journal of Operational Research, vol.187, 3, 2008,pp 1282-1292
2008A single machine batch scheduling problem with bounded batch sizeOron, Daniel; Mosheiov, Gur; Business AnalyticsA single machine batch scheduling problem with bounded batch size, European Journal of Operational Research, vol.187, 3, 2008,pp 1069-1079
2006Single machine scheduling with batch-dependent setup timesOron, Daniel; Mosheiov, Gur; Operations Management and EconometricsSingle machine scheduling with batch-dependent setup times, Information Processing Letters, vol.98,(2),2006,pp 73-78